Slab won't be laid for a couple of weeks. So nearer the end of the
Month. No massive rush but equally I'm egar to get things moving.
I'm a few miles outside Barrhead.
Steel frame, roof and side down to 2m are already up. So just need to bottom 2m built up to meet to side sheets.